Need to rely on government support

Web Design And Seo For www.china-webdesign.com
Emergency Warning Lights – China Manufacturer
Thank you for inquiry my Emergency Warning Lights, Tel:+86-574-82825261, Email:sales@911signal.com
http://www.911signal.com/key-Emergency-Warning-Lights-102/

LED street lamps promote the use of a process

     The application and promotion but also hinder the development of LED street lamp. LED street there is no formal standard specifications, color temperature, color rendering and glare of several key parameters has not yet been determined, LED lights can not be fully promoted. Secondly, the high price of LED streetlights to LED street to promote the application has caused great difficulties. Plus, LED street lighting standards and the road surface testing method using LED lights standard has not yet developed at this stage, the LED street lamp market development is dependent on government support.

LED street lamp market prospects

     From the current development status, the LED street light product prices are too high initial installation cost more than two times higher than the traditional street lights, LED street light by virtue of the economic benefits of energy saving, long life, maintenance-free advantages, through multi-year before we can emerge a longer period of economic recovery cycle has brought some of the obstacles to large-scale market-oriented development of LED street. At this stage, the LED street lamp market is still a pilot application-based, market development is primarily dependent on government support.

Posted in Uncategorized | Tagged , , | Comments Off

Baby sleeping bag to buy

Web Design And Seo For www.china-webdesign.com
baby clothes wholesaler – China Manufacturer
Thank you for inquiry my baby clothes wholesaler, Tel: 0086-371-65729960, E-mail: successfulstar@vip.sina.com
http://www.china-babyclothes.com/

Why the shape of the sleeping bag on the small? What are the disadvantages of straight sleeping bag?
Baby to sleep generally love animals, flared above the small, tight-fitting, does not affect the roll; hem to increase leg room; hem closed straight sleeping bag impact activities, the Practice has proved that 99% of the baby is not wearing the; there is often some their parents, several home sleeping bag, not a practical, the main style problems.
2, sleeping bags, why should be soft?
Children sleeping bags like rolling around, soft sleeping bag does not affect the turn over, less constrained, otherwise the baby is reluctant to wear; Second, the gap between the less personal, physical, and sleeping bags, warm better; to choose soft fabrics and folders cotton, to make sleeping bags soft.
3, sleeping bags, how long?
Sleeping bags and pajamas, quilt alternatives, not the size of clothes to buy; general, put the sleeping bag feet stay about 20cm space is more appropriate;
Simple calculation of the length of the sleeping bag method:
Sleeping bag from the shoulder began to wear less head height 20-25cm, so the sleeping bag is slightly longer than the height can be.
4, sleeping bags to thick?
This is a lot of mothers who are confused about the problem, the temperature of each prepared a sleeping bag, it would mean to the 10 a few sleeping bags? In fact, cold weather sleeping bag plus a tuck or blankets, can also serve to prevent the baby kick quilt effect, so not suitable for thick sleeping bag, a sleeping bag can be adapted to a variety of weather;
5, if your baby needs a sleeping bag?
The sleeping bag can effectively prevent the baby kick the quilt and therefore caused by the cold, creating a safe sleeping environment, the baby and the parents can sleep more soundly; Second, to prevent the infant climbed down the children s bed, or to prevent the baby s feet into his bed railing ; experts recommend a half months after the babies sleeping bag.

Posted in Uncategorized | Tagged , , | Comments Off

Clamp ball valve stainless steel clamps ball valve quick ball valve piece quick ball-piece ball valves stainless steel ball valve ball valve

Web Design And Seo For www.china-webdesign.com
1 inch pipe clamp – China Manufacturer
Thank you for inquiry my 1 inch pipe clamp, Tel: 0086-577-61603900, E-MAIL:sales@steel-pipeclamp.com
http://www.steel-pipeclamp.com/key-1-inch-pipe-clamp-42/

Nominal pressure :1.6-6 .4 MPa,
Temperature range: -20 ~ 232 ℃ ~ 350 ℃
Applicable media: water, oil, gas and certain corrosive liquids WOG
Thread Type: G? NPT.BSPT.BSP.DIN259/2999
Application areas: for food, pharmaceutical, petrochemical, electric power, metallurgy and other industrial pipelines.
Material:
Body: stainless steel
Seal: PTFE, PTFE enhanced
The ball valve working principle is to rely on rotary valve Love to make smooth or occlusion valve. The ball valve switch is lightweight, small size, can be made into a large caliber, reliable sealing, simple structure, easy maintenance, sealing surface and the spherical often in the closed state, is not easy to be medium erosion, has been widely used in various industries.
Characteristics:
A small fluid resistance, equal to the drag coefficient with the length of the barrel.
Simple structure, small size, light weight .3. Close and reliable valve sealing surface material widely used plastic, good sealing in the vacuum system has been widely used.
Easy to operate, opening and closing rapidly, from fully open to fully closed as long as the rotation of 90 °, to facilitate remote control.
Easy maintenance, simple structure, ball valves, and seals are generally activities, removal of the replacement is more convenient.
(6) in the fully open or fully closed, the ball and seat sealing surface and the dielectric isolation, through the media, does not cause erosion of the valve sealing surface.
7 for a wide range of diameter from small to several millimeters, a few meters from the high vacuum to high pressure can be applied.

Posted in Uncategorized | Tagged , , | Comments Off

The overall brand of the light source

Web Design And Seo For www.china-webdesign.com
Truck Light Bars – China Manufacturer
Thank you for inquiry my Truck Light Bars, Tel:+86-574-82825261, Email:sales@911signal.com
http://www.911signal.com/key-Truck-Light-Bars-101/

Pearl River Delta, a vast, wide distribution, no effective integration and focus on the existing light source enterprises. In addition, the higher cost of enterprises to foreign procurement of lighting accessories, their own production, will a corresponding increase in production costs, which lead to the costs of the enterprise. Therefore, how to effectively integrate the light source enterprise resource has become the subject of the PRD lighting industry group developing the most worth exploring. Light industrial integration is conducive to the development of the industry

In fact, the PRD have full strength, the lighting industry group in the Pearl River Delta flawed in make up, to form a closer lighting industry consortium.

First, there is strong domestic demand. Energy saving lamps, fluorescent lamps, ceiling lamps and other manufacturing companies need a lot of light fittings and Grille, tube lighting, and other enterprises requires a lot of light finished with matching the cycle flow of the Pearl River Delta, a large lighting industry groups exist large domestic market. Centralization and industrialization, light fittings and finished enterprises is conducive to the development of the Pearl River Delta, the lighting industry group.

Secondly, there is a perfect matching. At present, the Five Dynasties and light source products: incandescent, fluorescent, metal halide lamp, energy saving lamps, LED lights required accessories can be found in the Pearl River Delta region corresponding production enterprises, coupled with the cultivation of industrial clusters abundant experience, integration of the relative easier.

From the integration of meaning in terms of concentration and integration help lighting industry, light industry. Lighting industry in the Pearl River Delta and Yangtze River Delta region, the light integration between enterprises, between the region and regional coordination, complementarity, penetration and grafting. For the entire lighting industry in China is conducive to effectively regulate and manage the cohabitation of the lighting market, and more conducive to promoting the overall development of China s light industry, in order to build to compete with the world light giant "light" overall brand.

Posted in Uncategorized | Tagged , , | Comments Off

The city s successful handling of cliff road propylene spills

Web Design And Seo For www.china-webdesign.com
2 inch pipe clamp – China Manufacturer
Thank you for inquiry my 2 inch pipe clamp, Tel: 0086-577-61603900, E-MAIL:sales@steel-pipeclamp.com
http://www.steel-pipeclamp.com/key-2-inch-pipe-clamp-43/

Around 9:30 on the evening of April 9, a load 25 tons of propylene, from Lanzhou to Liaoning, license plate number for

Liao M-00 005 tankers in the days of precipitous road 65KM to +700 M-Office (Qinan Guo Jia town) rushed roll-over

accident occurred in a hedge lane, two Division support staff were injured, the propylene gas leak. Since propylene is

flammable and explosive volatile toxic chemical products, leakage risk and great danger, high-speed patrol Nishikawa

brigade 10:05 After receiving the alarm in a timely manner Alarming, cordoned off the area, the control of passing

vehicles; City Fire Brigade quickly organized after the 10:10 alarm fire Secret Squadron 30 soldiers led by Captains

and political commissar of the scene, activate the emergency warning plan, rescue plan; 10:30, Vice Mayor Yang Weijun

received a phone call and rushed to the scene guidance accident treatment. Immediately set up any commander in chief

by Vice Mayor Yang Weijun, Xue-Min Zhang of the Municipal Public Security Bureau, the Municipal Government Deputy

Secretary-General Chen informed, the Qinan Magistrate Po military deputy commander, City Administration, fire

protection, environmental protection, quality supervision and high-speed the Patrol Nishikawa brigade and other

relevant departments and units responsible for the human members of the accident disposal Command has overall

responsibility for carrying out rescue and rescue work. And convened by the the Qinan Government, Municipal Public

Security Bureau, Administration Bureau, the fire brigade and the Nishikawa brigade of high-speed patrol and the county

of the units responsible comrades seriously study the disposal program, to take six measures of rescue and rescue work

arrangements. First, take all measures to make every effort to help staff of the two injured Division medical

treatment, to ensure that injured people receive timely and effective treatment, and specifically by the The Qinan

government is responsible. Chemical properties of propylene, hazardous and harmful levels, emergency rescue approach

by the fire brigade is responsible for further consultation, submit a comprehensive, safe, reliable rescue program.

Quickly organized a fire Secret Squadron personnel ensure its own security, to the scene of the accident to conduct

reconnaissance, master accurate information on the rescue program to be refined. Site reconnaissance, if the leak

within the controllable range, the evening timely plugging disposal of; If the leak is severe, the rapid evacuation of

the surrounding masses, and to strengthen the duty patrol, to prevent open flames and power cause a fire. Fifth, the

line of traffic control is strictly prohibited vehicles and pedestrians near the site of the accident. Sixth, as soon

as possible, collate and analyze the accident reported to the relevant departments according to the channels and

procedures.

About 1:30 pm on the 10th, the six officers dispatched to the scene reconnaissance to return to the command location,

and feedback on the specific circumstances of the accident scene. Yang Weijun again convene the relevant departments,

the people responsible for the study and formulate the specific operation of the rescue and rescue program, instructed

the fire brigade, night repair, and to ask the fire fighters to be calm and composed, in strict accordance with the

early warning plan to rescue, in strict accordance with the operation of technical regulations to ensure their own

safety ensure the successful completion of the rescue work.

The fire fighters regardless of task difficulty at night, at considerable personal risk, carried out emergency

repairs. To 3:10, tankers within the pressure too much, the body floating, evening jobs inconvenience and other

reasons, resulting in the repair work can not continue. Determined by field studies, the repair work is temporarily

suspended, until 7 o clock start on time and continue to repair. Yang Weijun requirements, high-speed patrol Nishikawa

brigade closely guarded section of the incident, and guide the vehicle bypass in the past exercised to prevent the

occurrence of an accident, and heavy vehicle drivers stranded in the national highway to do the food, drinking water

supply services; The public security organs to step up patrols and the Qinan common do the work of the surrounding

masses; fire brigade plugging measures to seriously study and repair program as soon as possible to clear the road;

Safety Supervision Bureau as soon as possible and report to higher authorities, and to get in touch with propylene

manufacturers technical advice, the rescue program and ensure that rescue and rescue work is completed as soon as

possible.

7:00 am on the 10th, accident disposal of members of the headquarters all in place to guide the conduct rescue and

rescue work. The fire fighters nearly four hours of hard work, a bandage block approach to body leaks, preliminary

blocking, effective control of a propylene leak.

After the accident, attended the meeting in Lanzhou Municipal Committee, director of the Municipal People s Congress,

Zhao, and Mayor Zhang Guangzhi listen to at home, leading the report on the circumstances of the accident,

respectively, by telephone have made important instructions, requiring the relevant departments, units to strengthen

organizational leadership, depend on the actual job responsibilities, under the premise of ensuring the safety of

rescue personnel, to be properly disposed of, and ensure the safety of the roads open and the people s lives and

property. Zhang Guangzhi mayor also rushed to the scene supervision and guidance of emergency rescue work.

Headquarters after the accident disposal reporting, communication and contact, the Provincial Administration of Work

Safety, Deputy Secretary Qiyong Gang and the fire brigade, the provincial highway, the Portland company s leaders and

technical experts arrived in the scene, the full communication and repeated demonstration, Finally, determine to take

the program to complete the accident disposal after the accident body of plugging to flatbed shipped back to Lanzhou.

Specific high-speed traffic police detachment responsible for the implementation of the 50-tonnage cranes, two large

distribution center from Lanzhou to implement a 60-ton flatbed contact from Lanzhou. Completed loading by high-speed

patrol Nishikawa brigade sent a car to clear the way for the city fire brigade to send fire engines and an escort,

Municipal Quality Supervision Bureau and the Municipal Environmental Protection Bureau to participate in each one of

the Deputy Secretary, responsible for the way safety testing. Research to develop programs at the same time, the

command calls the hydraulic clamp body leak hose clamp flat, propylene leak at 16:00 completely block success.

At 0:00 on the April 11 to 8:00, one-way clearance for passing vehicles. That morning, two crane and a flatbed truck

arrived from Lanzhou transferred to the scene. From 7:00 through the close collaboration of more than four hours of

the accident dispose of all the members of the headquarters, fire fighters, and technical staff, the successful

completion of the body hanging from the work load. At 11:12, the body in the high-speed traffic police detachment and

other interested parties, under escort, transported to Lanzhou. 1:30, Tianchan Highway formal two-way traffic. At this

point, from propylene spill has been successfully disposed of.

Posted in Uncategorized | Tagged , , | Comments Off

The actual situation

Web Design And Seo For www.china-webdesign.com
wood composite deck – China Manufacturer
Thank you for inquiry my wood composite deck, TEL:+86 575 82001678, E-MAIL:sales1@wpcflooring.com
http://www.wpcdeck.net/Wood-plastic-composite-deck/

The training includes aspects of the measurement of knowledge, and measures laws and regulations. Municipal Quality Supervision Bureau law enforcement personnel and the quality indicator by the technical staff combined with the actual the Manzhouli

timber processing enterprises to highlight the measurement of management to promote the role of enterprise development, the requirements of the metrological administrative departments of enterprise legal metrology, metrology, measuring instruments ,

maintenance how to strengthen the measurement with the test as well as business management, and promoting the development of content.

Through training, so that companies recognize that, according to the law test measuring instruments in use, the operation of order, management should be based on science, to better ensure the accurate measurement of production, in order to ensure

product quality. Law enforcement officers combined with the needs of the enterprise production and management and measurement management, a detailed explanation on how to build and improve the measurement management system.

Through training, to further clarify the main responsibility of measurement management of wood processing enterprises, to enhance the measurement of awareness and improve the measurement level of management, and promote the healthy

development of the wood processing industry in Manzhouli.

Posted in Uncategorized | Tagged , , | Comments Off

Of wood drying equipment industry the development of urgent technical specifications

Web Design And Seo For www.china-webdesign.com
dryers industrial – China Manufacturer
Thank you for inquiry my dryers industrial, Tel:86-0371-63431169 E-MAIL:sales@machinezy.com
http://www.crusherzy.com/key-dryers-industrial-124/

 In recent years, China s wood drying industry is booming, lumber drying industry and drying equipment market is thriving. However, in the wood drying industry in China in the process of industrialization, industrialization, modernization, there are many problems.
    Since the 1980s, China s wood drying science and technology workers developed a series of national and industry technical standards, these standards to technical specifications provided the basis for our wood drying equipment market. However, due to inadequate publicity, poor information exchange, the grassroots do not quite understand the standards and specifications, and some simply do not know; some one-sided implementation; some turn a deaf ear, its own way, causing confusion on the market the technology, the impact of the improvement of product quality and business reputation, harm the interests of the use of the unit, causing unnecessary disputes.
    It is understood that the absence of technical specifications, wood drying litigation growing number of cases, mainly in three categories: First, drying equipment disputes, including the acceptance of equipment, assembly, materials, specifications and performance parameters, drying equipment, controlled device precision drying The quality of the drying equipment technology property rights; drying quality disputes; disputes arising from the concept of fuzzy agreement provisions.
    Wood drying equipment sales contracts generally specify the product model, the capacity of the shell material, the control unit, quantity, price, and very few involved in the wood-heap cycle of wind speed and wind speed distribution, the dielectric maximum temperature, dielectric heating rate and temperature distribution, dry Room insulation, airtight, corrosion resistance, energy consumption, drying quality, drying costs and other technical and economic indicators. The same time, the drying equipment manufacturing companies rarely develop certain models of the enterprise corporate standards, and therefore difficult to product acceptance, are often so disputes. Some companies developed new products, neither the production test after a certain time, and few technical appraisal, that is put into mass production, resulting in product quality can not be guaranteed.
    National standard lumber drying equipment performance testing methods "in the conventional, dehumidification, vacuum, solar drying device performance and detection methods have specific requirements, supply and demand sides are mostly not followed. If you can of the main types of wood drying equipment stereotypes, standardization and serialization, and then in accordance with the type of device to the development of national, industry or enterprise standards specified various types of equipment should meet the technical and economic indicators, you can both supply and demand evidence to follow, so that the wood drying equipment market and the track of scientific management.

Posted in Uncategorized | Tagged , , | Comments Off

Five points in the safe operation of the distribution transformers

Web Design And Seo For www.china-webdesign.com
Main Power Transformer – China Manufacturer
Thank you for inquiry my Main Power Transformer, TEL: 0086-577-62767791, E-mail: frank@chinesetransformer.com
http://www.chinesetransformer.com/key-main-power-transformer-12/

 Distribution transformers in the distribution network. Routine maintenance, you need to pay special attention to five aspects of the relationship between its safe operation.

        First, ensure that the temperature and the temperature rise within the specified scope:

        When the ambient temperature of 40 degrees Celsius, the limits of the distribution transformer winding temperature of 105 degrees Celsius, the limit temperature of the transformer top oil temperature does not exceed 85 degrees Celsius. The oil temperature exceeds the allowable value for a long time, easy to make the transformer insulation aging damage. In addition, the maximum allowable winding temperature rise of 65 degrees Celsius, the top oil temperature long-term allowable temperature rise of 45 degrees Celsius, as long as the top oil temperature and the temperature does not exceed the specified value, we can guarantee the safe operation of the transformer within the provisions of the useful life.

        Second, concern about the normal load and accident overload ability to run:

        When accidents occur, in order to ensure continuous power supply and the rapid elimination of the failure of major electrical equipment, distribution transformers and allows a short time overload. But this time, should be the implementation of forced air cooling measures, the top oil temperature is controlled at 95 degrees Celsius, or insulating oil deterioration, and ultimately damage the transformer.

        Third, keep the three-phase load balancing:

        Pay special attention to the secondary side of the symmetry of the three-phase load. When the serious imbalance of the three-phase load, heavy load phase voltage drop, increased light load phase voltage deviation to expand to a certain extent, will threaten the safety of electrical equipment.

        Fourth, ensure that the supply voltage to allow fluctuations in value does not exceed the rating:

        When the transformer voltage is higher than its rated voltage, the excitation voltage is increased, resulting in overheating of the core loss increased, reactive power also increases, resulting in a serious distortion of the secondary winding electromotive force, increased motor and line attached loss, caused by harmonic resonance in the system, resulting in over-voltage appear, distribution transformers and other electrical equipment insulation will cause harm. Therefore, the supply voltage distribution transformers generally do not exceed the rating of plus or minus five percent.

        Fifth, visits to check:

        Management staff of the distribution transformer according to the procedures, inspection tours, and double-check their voice is normal, whether the oil spill, oil leakage phenomenon, the actual temperature is consistent with the thermometer, the insulating sleeve is clean, the second lead wire and contact The point is solid and so on. Visits to check the process, the general instruments, protection devices, lights and other equipment, to understand its operation. But also through a variety of senses to observe, listen, so that timely detection of potential safety problems, and eliminating defects in time, safeguard the normal operation.

Posted in Uncategorized | Tagged , , | Comments Off

Copper and copper alloy welding procedures

Web Design And Seo For www.china-webdesign.com
Welding Material – China Manufacturer
Thank you for inquiry my Welding Material, TEL:0086-571-63725979, EMAIL:china@hzdayang.cn
http://www.hzdayang.com/key-welding-electrode-material-2/

This procedure provides the basic requirements for copper and copper alloy welding, GTAW for copper and copper alloy, welding, melting inert gas welding and automatic submerged arc welding of copper and copper alloy single container lined copper container, copper welding process.
Welding materials:

Welding argon purity ≥ 99.99%, dew point ≤ -50 ° C, and shall conform to the provisions of GB/T4842 or GB10624. When the bottled argon pressure ≤ 0.5Mpa unfit for use. When preheat inconvenient or require penetration when available 70% Ar +30% N2 gas mixture. Nitrogen and helium as shielding gas is argon penetration of 2 to 3 times, but nitrogen gas pores increased tendency.
Two.
GTAW electrodes with cerium tungsten electrodes. The electrode diameter should be selected according to the welding current size (using the general requirements than the welding current specifications One tungsten),
3.
The main role of the flux is to remove the oxide film, and other impurities, to prevent the molten pool of metal oxide and other gas into the bath, and improve the flow of liquid metal. Available when using absolute alcohol into a paste or flux powder on the groove and on both sides and then welded or wire ritual flux. You can also use gas shielded arc welding flux to enhance the protective effect of the weld pool.
4.
The more important structures in order to eliminate the adverse effects of oxygen, must be selected with strong deoxidizer such as aluminum, titanium wire; can be used in order to prevent the alloying elements in the oxidation and evaporation during the welding process: welding brass (to prevent the zinc oxide and evaporation) silicone wire and rapid welding to reduce the high temperature residence time when the solder bronze (tin to prevent oxidation and evaporation) can be silicon, phosphorus and other deoxidizer wire with borax and boric acid flux, welding aluminum bronze (to prevent aluminum oxidation and evaporation ) can be used chloride salt and fluoride salt flux.
+ F: v * ~ 5 o2 Y7 for Q4 l (I * w1}
(@! X7, o8 v4 @ 1 c3, a * w8 P5, _
Second, welding welder:
A.
Should GB50236 the provisions site equipment, industrial pipe welding in the construction and acceptance of "passing the examination.
Third, before welding to prepare:
A.
Flame ionization method for processing from the color part of the machining to remove copper groove processing should be used by mechanical means (including shear), such as the use of not less than 3mm, the groove processed surface should be flat, smooth, without cracks, delamination , inclusions, burrs, flash and oxidation color. Groove surface was metallic luster; the groove and on both sides when necessary, should normally be not less than 30 mm within 100% PT. . D3, X-: ~ 4 Z% K! E3 @ /]
Two.
Wire, not less than 30 mm range must be the surface of the water surface and sides of the groove, the oil spill to clean up (including to the surface of the oxide film, scales, pollution and the failure of oxidation color). Available φ0.15 ~ 0.2 stainless steel wire tray polished brush metal grinding head, and acetone (acetone-moistened cloth should be clean, do not use cotton or cotton, in order to avoid a wipe with a plush), it should be noted that these tools prior to use clean up; try not to use the grinding wheel.
3.
Assigned parts of the thermal processing, such as closing the first class, in principle, into the plant response to the copper surface of 100% of the PT, when necessary, parts can not be determined by RT. 8 H [/ V0 P8 {1 P-P
4.
Wire surface can be used stainless steel wire brush or a clean oil sandpaper to scrub; also need chemical cleaning surface oxide thick wire polished before welding. Chemical cleaning: HNO375cm3 / L + H2SO4100cm3 / L + HCl75cm3 / L mixture of cleaning, and then the alkaline wash, and finally drying with a clean rinse hot air. Copper also can refer to this method. ; O5 Z7 ^ 3 u% m; Z-
5
Clean welding wire and welding should be kept clean and dry by hand may not touch the welding position, welding is prohibited pollution, or should be re-clean up local pollution can be partially re-clean-up; best with a white cover on both sides in the groove . Not welding, such as clean up after 8h ago should be re-weld clean up. Y A4 O $ 4 r4 d, D (w ]! W
6 (A) @ 3 c8 – H0 is v: P +? I {# E,
Weldment assembly should be accurate, should be considered if the assembly of non replacement parts, and not to force the group to avoid causing too much stress. In deal with groove dimensions to be checked before the formal welding, and after passing the welding.
7.
The selection of tack welding wire and take process measures and welding.
8.
Weldment group in the stress concentration (such as the weld at the intersection and the workpiece on the corner, etc.) to avoid tack welding, positioning the weld without cracks, porosity, slag and other defects, otherwise it must be removed to re-welding. Heavy welding should be carried out in the nearby area, rather than in the original spot.
9 (j0 the F2 f-b: a4, q4 _
Arc panels and back arc plate welded longitudinal seam must be placed at both ends of the weldment, arc boards and back-arc plate and welded the same grade and thickness of copper. Welding girth try to avoid the crater. # N6, B, l7 W * c
10.
Positioning solder joint cracking during the welding process, resulting in the board edge dislocation or gap change, you should immediately stop welding, in order to continue after repair welding. 3 `1 K, the" w v $ the A6 [
11.
The plate material is generally produced graphite plate, because the graphite thermal conductivity and slow, good insulation. When the copper thick plate assembly gap can be used clay mud to seal the gap, can be removed after welding. Flux (in this case the submerged arc welding such as HJ431) can also be used if the current large should also consider the flux layer should have a certain thickness. Plate size in the figure: | 0: n% Y8 V5 _ * f Z6 T4 in a
Welding requirements: 1 i Q, X9 @ ( $ I, E, & e
1 $ J-R * j9 D, B2 r) q & a)
Qualified welders shall be welded to the welding process files and other documents. ; D-L m1 is [r
2.7 H-([: k5 the Z6 b% _ (V% c2, J of
In the welding environment is one of the following conditions, should take effective protective measures will not be permitted welding: v + s # o5 r (? E; the F
1); S * Q "v: J of T1 e m m, X-
Welding environment dirty, dust, smoke;
2) $} 4 f; the S8 J D2, the q1 F-{!
Welding environment wind speed is greater than or equal to 1.5m / s; 5] 2 o3 U! D, o2 U / Q
N-3) 8; C: n, m # {w
Welding environment relative humidity greater than 80%;
4) – B, D,-M g / o9; d & F & g,; the E3 E,
Rain, snow outdoor operations;
5)
Soldering temperature is below 5 ° C;
3.
Copper welding located in a dedicated venue, the venue shall be paved with rubber or flannel; welding should be away from the vents and doors and windows to avoid the effect of gas protection.
4.
Manual tungsten inert gas welding welding pure copper, brass (Cu-Zn), tin bronze (Cu-Sn) and copper-nickel alloy (Cu-Ni) with the DCSP; aluminum bronze (Cu-Al) and silicon bronze (Cu -Si) AC to remove the surface oxide film. Melt TIG welding and automatic submerged arc welding using DCRP. 8 a3, I4 M7, S & the F4 o # w # N; v * n
5
Should preheat before welding preheating: strong copper thermal conductivity, therefore general GTAW welding is greater than the thickness of 4mm pure copper 4 ~ 12mm preheat 200 ~ 450 ℃; bronze and copper-nickel alloy Pre-150 ~ 200 ℃; silicon bronze and phosphor bronze may from time to preheat and control interpass temperature does not exceed 100 ℃. Depending on the particular circumstances flame or far infrared panels for heating. # ~! Y / O $ h4 the T9 U the A9 @ I
6.8 a & J1 B; m r / m s
Welding copper and bronze are generally neutral flame, oxidizing flame could easily lead to element burning, reducing flame containing H and prone to porosity. Brass with a weak oxidizing flame, in order to generate zinc oxide and off the H reduce pores. Gas welding groove is generally not the only single-sided single-layer welding, to avoid multiple multi-pass welding deformation. To grain refinement after welding, hammering, such as the plate thickness does not exceed 5mm along the weld on both sides of 100mm at the hammer, when the thickness is greater than 5mm can be first heated to 500-600 degrees hammering, and then heated to 500 to 600 degrees water is chilling.
7.
A weld should first welding finished, forced to a stop after welding, welding, overlap 10 to 20 mm. Thoroughly to remove surface contamination, slag and other defects. Crater should be filled, then the arc at the fusion penetration. General extinction heap high extinction law: Crater uniform elevation arc, while accelerating the filler wire, until the arc goes out, the extinction at the weld local bulge, if necessary, polished excessive I. Attenuation device on welding machine, arc this off better. F-W% r @ d (f "_ / K) U
8 * W + {3 of c9 K, ~
/ N-e8 &?? L,
C and Class D connector weld and parent material was a smooth transition. ; The V8 f + Z # F & [0 {8 N $ J
9%]: n! I. T * Q
The surface of the weld and heat affected zone should be carried out 100% inspection, no cracks, incomplete fusion, porosity, craters, slag and spatter defects in the weld outside should not fight the arc spot.
10 # the P4 r! The V8 P8 h # 3 q3 H
Copper pressure vessel weld surface should not be undercut. Undercut depth of the weld surface of the pressure vessel should not exceed 0.5mm, undercut continuous length should not exceed 100mm, total length of the undercut of the weld on both sides of the weld length should not exceed 10%.
11 w-z + W (Y: A2 {"& Z + a + w
Should be noted that copper welding of overhead position welding is not easy to achieve, generally do not arrange such a position. 9 Z6 0? 0 of P (E1}; c & u! Y3 M; p
12.0 x1 g, P% of K0 h * `4 {6 X (F (|
Heat exchanger heat transfer tube welding sequence: the tube plate assembly (heat transfer tube set aside shall be not less than 4mm in length, so that the back of the machine processing); tube-side and tube sheet cleaning; one end of the expander; welded side tube plate; machining is not welding The heat exchange tubes tube end; expander; tube-side and tube sheet clean-up; welding heat transfer tube is not welded side. Welding the first layer is generally not the Lifting welding (the first layer of whether PT or air tightness testing required), but other layers should Holes welding.
13 & | # c1 k3 of the B + A% ^ 8 A
Copper & J% G # L2, V (c2 N;]
, Weld repair: d # y & e # D * T7 in K1, X-
A.
Should analyze the need to repair the defect causes, suggest improvements, and the preparation of welding repair process (consider machining installed anti-welding deformation) to rework (table weld defects under normal circumstances and the reasons for analysis);
Two.
The same parts of the weld repair number of not more than two times. -] N6, m,! K + j% ~ & L6 U $ M5, p
3.4 E, & (f) f + {r
General metal grinding head clear of defects and groove. Defects deeper, you can use the prescribed manual milling grinding, and then the metal grinding head polishing the surface of the groove. Groove width of the uniform, smooth surface and ease of welding groove, the groove at both ends of a certain slope (generally not more than 1:3). , P. `[9 the M8 the J-O0 Q-
4.) @ & _ * The G0 _7} "^" z1 + M6, I h + N
Rework before defects need to be cleaned, should generally be 100% PT to confirm (if the defect is a crack, it must be 100% PT). Welding when defects divisible can not dig deep, when necessary, RT confirm the defect has been completely removed. First, not when welding with filler wire, metal melting arc welding District; filler wire arc should be a little biased wire, anti-welding metal overheating in arc welding length direction modest move back and forth to extend the bath exist time, in order to facilitate the hydrogen bubbles escaping from the molten bath.
5 $ o * P8 s0 D * M & S
Repair weld performance and quality requirements should be the same as the original weld;% h z4 f w) `9 z-
6. "U + Q9 is B, m) B, T-$ T-
Copper welding weld defect pores and cracks:
6.1 stomatal causes: Copper Weld porosity is mainly hydrogen into the weld pool formed. Sources of hydrogen are: material, welding wire, shielding gas, wire feeder, welder s gloves and environmental humidity is too high, such as wire contaminated material and wire the oxide film, wire feeder, oil or condensate perspiration. Preventive measures:
6.1.1 Materials and hydrogen content in the wire ≤ 0.4mL / 100g; & the z9 h8 h1 @ $ J6, E4, "~: u
6.1.2 was the weldment surface should remove the oil and oxide film, the storage time of not more than 4h. Surface cleaning dry clean, lint objects cover the groove and on both sides; 2 w (w8 B H2, l4 b0 q @
6.1.3 wire to make use of polished wire, or processing as above; 0 S (v1 Y8 B + `/ w" O: F
6.1.4 shielding gas impurities: H2, ≤ 0.001%; ??of O2 ≤ 0.02%; N2, ≤ 0.1%; H2O, ≤ 0.02%; + t: X: V0 p1 is i $ i $ R9, a, E-]
6.1.5 protect the gas pipeline: the general use of stainless steel pipe or copper tube, hoses plastic tube without the use of rubber and other easy to absorb water hose; should check the cooling water pipes before welding to ensure no leakage; When the environment is very humid deal with the protective gas is heated to purge piping; [5 L + qm * `6 t4 _
6.1.6 to send the wire agencies: Do not oil, wire with Teflon tubing before welding and clean up pollution and condensation of water in the tube;
6.1.7 The environment of the scene: the temperature should not exceed 25 ℃, relative humidity of not more than 50%, keeping the environment clean; the F-U) A!] +
6.1.8 Welder: Work clothing as much as possible is white, in order to timely detect and clean up pollution. When welding sweat and grease do not re-contaminated weldments; x * N! W $ m1 is Y8 ^ 1 h0 the R
6.1.9 should be in the test panel before welding test welding, in order to check whether the protection of gas and pipeline qualified.
6.1.10 The welding process on preventive measures instead of single-sided welding: welding with double-sided; each weld thin than thick, the pores escape; large diameter wire to reduce the pores; preheat and slow cooling after welding ; lower arc voltage, increasing the current, lower welding speed, and helps to reduce the pores. % O) L + t p9 f I7, K & the Z8 O $ n, {the G8 u
6.2 crack causes: material weldability is poor; select the wire did not consider the crack resistance; structure binding spent. Preventive measures: & o1 G $ A {0 Q8 M B # [4 @ W
6.2.1 poor weldability of copper before soldering should consider the crack can not only consider the strength; necessary, consider the weldments were annealed after welding, welding and then quench aging. V * A; P #] 2 [+ Z # G. The W j
6.2.2 Select the anti-crack and good wire, such as those containing Si in low-melting-point element of the wire.
6.2.3 minimize the degree of binding of the welded joints, and reasonable arrangements for the welding sequence to weld horizontal shrinkage margin, to reduce welding stress. There is no need to tack welding, do not weld tack welding, double-sided, do not tack welding sided tack welding.
6.2.4 as far as possible to change the one-side welding for double-sided welding. E) I-s (b
VI testing requirements:
A.
Patchwork welding of the head should be 100% RT, forming before the provisions of 100% RT or 100% PT.
2.8 X $ R (`3]% j3 the g7 the F
A and Class B welds are generally 100% by RT.
3.5 _3 i |: _: x8 A: J
Class C, D, welded joints in the container 100% PT.
4.1] A4 {M & y-) P3, the F
Copper surface welding weld 100% PT.
: _ The E / u: {1 w2 y5 y-
After the removal of copper fixtures and reinforcement of temporary fixed connection weld welding marks 100% PT.
6.
Other design requirements to the site of the flaw.

Posted in Uncategorized | Tagged , , | Comments Off

Concrete products machinery rapid development of open ice-breaking trip

Web Design And Seo For www.china-webdesign.com
clay brick machinery – China Manufacturer
Thank you for inquiry my clay brick machinery, Tel:86-0371-63431169 E-MAIL:sales@machinezy.com
http://www.crusherzy.com/key-clay-brick-machinery-103/

     Concrete Products Machinery Branch of China Construction Machinery Industry Association 2010 Annual Conference and technical exchanges on December 19, 2010 was held in Xiamen, from industry representatives and members of major companies across the country on behalf of more than 30 people attended the meeting.

    The leaders attending the meeting China Building Block Association, honorary president Professor Tao Yousheng the State Building Materials Industry Productivity Promotion Center experts, senior engineer of solid waste comprehensive utilization of the honorary director of the Professional Committee of Housing, Building Materials Branch, vice chairman and secretary general of Professor Xie Yaosheng China Northeast Architectural Design & Research Institute senior engineer, deputy chief engineer, Professor Tang Mingxian. This meeting is co-opted the Beijing Rui Tuke Technology Co., Ltd. Li Hengfang chairman of the board the Fortress Hongyi Li Yang, Building Material Machinery Co., Ltd., Quanzhou water chairman, the Fujian Springs Machinery Co., Ltd. Fu Binghuang chairman, vice chairman. The meeting examined and adopted concrete products machinery industry, the Technical Expert Group (for trial implementation) "Branch Technical Expert Group set up by 7 Taoyou Sheng, Tang Mingxian, Wang Guoli, Yan Yonghua, Caoying Hui, Li Hengfang, the water Li Yang comrades, bear the heavy responsibility of leading the development of the industry, the Group will be the development of the industry technical advisory think tank. The branch chairman Liu GOLD researcher made a special report entitled "concrete products machinery industry status and development trend analysis of the industry status quo, there are issues and trends. Branch Secretary-General Zhang sound military high work report of the Branch summary of the work in 2010 and 2011 work plan, to promote industry-wide product certification, strengthening the construction of industry self-regulation, at the same time the idea of ??the development of the industry.

    Carried out technical exchange activities, Tao Yousheng honorary president made a special report entitled "concrete block and block construction and development", Professor Xie Yaosheng made the topic entitled "solid waste in building materials report, Professor Tang Mingxian made a special report entitled "The development of the block making machine, Cao Yinghui made a special report entitled" ecological conditions of the block making machinery manufacturing enterprises and their products technology ", Liheng Fang, vice chairman, made a presentation entitled abroad concrete products machinery developments, special reports, the Hongchang Ober, Fujian Environmental Protection Building Materials Co., Ltd. Wang labor, general manager, made a presentation entitled "deep processing technology of the new wall materials – composite insulation bricks (blocks) thematic reports, the Langfang Hayes Building Material Machinery Co., Ltd. Wei China chief engineer made a special report entitled "concrete block production line of advanced control technologies, the peaks of Intelligent Machines, AG Wang, Discovery chief engineer made a presentation entitled" determined by a mathematical model brick brick-concrete pavement design method "special report, macro, Shenyang, Qinhuangdao and New Building Materials Co., Ltd. Tak Hoi chief engineer made a special report entitled solar curing process of concrete products – Edited by Hal Foster Conservation Act, also invited the Chinese construction Certification Center of the Research Institute of Ma Jie, deputy director made the promotion of product certification of the construction project, strengthen the supervision of concrete products machinery industry presentations. Exchange rich in content, involving the most advanced vibration technology, control technology, conservation, brick design, as well as domestic and foreign equipment developments. December 20, the delegates visited the Spring Machinery Manufacturing Co., Ltd. manufacturing plant and production products. The participants agreed that this meeting content-rich, rewarding, the deputies divertissement still not entirely, for a long time to get together to discuss development of the industry, a long time could not bear to leave.

    Concrete products machinery industry in 2010 and achieved rapid development, the vast majority of enterprise value to obtain a substantial increase of more than 50%, but the current industry disorderly competition is fierce, an adverse impact on the development of the industry. Annual meeting to break the impasse with less industry activity, an important measure to strengthen the industry self-regulation, creating the atmosphere of industry solidarity and pragmatic, open concrete products machinery industry to standardize the development of ice-breaking trip.

Posted in Uncategorized | Tagged , , | Comments Off